ADS-tec OPC5012 Manuale Utente Pagina 13

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 25
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 12
Industrial PCs OPC5012
© ads-tec GmbH • Raiffeisenstr.14 • 70771 Leinfelden-Echterdingen
13
4.2 CABLE INSTALLATION
The device interfaces and power supply plug are found on the side or the back of the
casing. Care should be taken not to damage the pins when connecting the plugs.
4.3 STARTUP PROCEDURE
For 24 V DC device: Place the cable end
sleeves of the power cable wires in the terminals.
Connect the cable for serial / parallel data transfer and fasten the plugs to the sockets.
Connect all further required cables and secure against slippage.
4.4 OPERATIONAL READINESS CHECK
Connect the power cable to the power source.
Check the device to determine whether hidden damages have been caused by
improper transport, incorrect operation or storage conditions or improper handling
(e.g. smoke emission from the device, etc.). If damages are found, immediately
shut down the device and protect it against unintentional startup.
Vedere la pagina 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 24 25

Commenti su questo manuale

Nessun commento